Power Profiles for the Operations That Build Tomorrow.

Six verticals. Six load profiles. Six code frameworks. This is the engineering reference where refinery operators, mine superintendents, data-center facility leads, and grid planners find the generator and microgrid configuration that matches their duty cycle, runtime window, and governing regulation. Every reference points to a single, written deliverable: a no-cost Site Assessment staffed by one senior engineer end-to-end.

  • Power Range Covered250 kW – 25 MW per site
  • ConfigurationDiesel · Gas · Hybrid
  • Engineering Response4 h 12 min · 24/7/365

APPLICATION MATRIX  //  6 VERTICALS

Six Verticals, Six Written Deployments.

Each row is an anonymous deployable reference: capacity, runtime, governing code, and the single CTA that scopes a project of your size. Pick the vertical that matches your load profile. If the duty cycle does not fit any of the six rows below, request an engineering call — the seventh vertical will likely start there.

Vertical Reference Deployment Power Range Duty Profile Governing Code / Driver Action
Manufacturing Process plants · Tier-1 OEM suppliers 3.4 MW continuous-duty hybrid plant, 41-day runtime cycle, Gulf Coast Tier-1 composites facility 2.5–12 MWMulti-unit prime 8,760 h/yr continuous, 22% average load, peak-shave window 14:00–19:00 local NFPA 110 Type 10 · UL 2200 · ISO 8528-5 · EPA Tier 4 Final Scope Plant Site Assessment
Oil & Gas Upstream · Midstream · Downstream 6.8 MW gas-fired platform generator set, sour-service skid, 11-month unattended deployment 3–25 MWGas & diesel hybrid 1,300–2,400 h/yr intermittent, N+1 redundancy, black-start required, 72-hour fuel resilience API RP 2350 · EPA NSPS OOOOa · NFPA 110 Class X · API STD 650 tank farms Scope Upstream Site Assessment
Data Centers Colo · Hyperscale · Edge 11.2 MW N+1 medium-voltage deployment, 48-hour fuel autonomy, Uptime Tier III / IV intent 5–25 MWParalleled gensets Block-load acceptance < 10 s, 0.8 PF leading acceptable, 48–96 h fuel autonomy NFPA 110 Type 10 · Uptime Institute Tier III/IV · IEEE 1547-2018 · ASHRAE 90.4 Scope Data-Hall Site Assessment
Mining Hard rock · Copper · Lithium · Coal 4.2 MW hybrid microgrid, off-grid copper concentrate operation, Antofagasta 2–18 MWPV+ESS+genset hybrid 5,800–7,300 h/yr continuous, off-grid; renewable fraction 38–62% seasonal swing IEC 61850 · MSHA 30 CFR 75 · ISO 8528-5 · EPA Tier 4 Final (non-road) Scope Remote-Site Site Assessment
Utilities Investor-owned · Coop · Municipal 9.6 MW peaking + black-start substation, 138 kV interconnection, behind-the-meter 8–25 MWSynchronous + BESS 250–900 starts/yr dispatch duty, 10-min ramp, grid-following → grid-forming IEEE 1547-2018 · NERC PRC-005 · IEC 61850-3 · EPA Tier 4 Final Scope Substation Site Assessment
Healthcare & Mission-Critical Hospitals · Labs · Emergency dispatch 2.4 MW mission-critical deploy, 96-hour fuel, 4 s block-load acceptance, 24/7 staffed 0.75–6 MWNFPA 110 Type 10 4-second block-load pick-up, 96 h fuel autonomy, ATS maintenance contract bundled NFPA 110 Chapter 7 · NFPA 99 · CMS SāC · Joint Commission EC.02.05.03 Scope Hospital Site Assessment

All capacity ranges are nominal continuous, ambient 40°C, altitude ≤ 1,000 m. Higher-altitude or higher-ambient sites are derated during the Site Assessment. Cross-mountain or remote deployments drawn from /capabilities/ typically require a parallel battery energy storage system (BESS) for spinning reserve and step-load mitigation.

FLEET FOOTPRINT  //  FY 2024 CLOSE

By the Numbers, Not by the Logo.

  1. 1,840 Power systems commissioned across 14 countries and four continents since 2008.
  2. 3.1 GW Cumulative installed capacity across diesel, natural gas, and hybrid configurations.
  3. 500 PowerCore-Hybrid units shipped to date; the 500th is a 4.2 MW microgrid bound for Antofagasta, Chile.
  4. 4 h 12 m Average response on emergency service tickets. Dispatch is staffed 24/7/365, no voicemail tree.
  • UL 2200Listed, full line
  • EPA Tier 4 FinalVerified by CSA Group, 90-day audit cycle
  • ISO 8528-5Performance Class G3
  • IEEE 15472018 interop compliant
  • NFPA 110Type 10, Class X
  • AEE 2023Contractor of the Year

UTILITY GUIDE  //  WHICH VERTICAL ARE YOU?

Find the Vertical That Matches Your Load Profile.

If your project sits between the named verticals, use the duty-cycle filter below to land on the right application card and the right spec sheet. Every duty profile has a primary vertical owner at WesCorp; cross-vertical assemblies (e.g., a manufacturing facility behind a utility substation) are scoped jointly.

Prime Power

Site operates off-grid or in an area with grid availability < 80% of the year. Typical load factors 65–90%, 8,760 h/yr.

Routes toMining & remote O&G

Why: continuous-duty profiles are tuned for diesel-runtime minimums before hybrid dispatch takes over. Battery-first off-grid microgrids land here.

Backup / Emergency

Site carries grid power as primary; genset enters on utility outage, ATS-controlled, tested weekly.

Routes toHealthcare · Data Centers

Why: 4-second block-load acceptance and 96-hour fuel autonomy are the binding constraints — these live on the NFPA 110 Type 10 row.

Peak Shaving

Site dispatches genset for 2–6 hours per day to reduce demand-charge exposure or local distribution congestion.

Routes toManufacturing · Utilities

Why: hybrid paralleling with BESS smooths the dispatch envelope; utilities layer grid-services capability on top of the same skid.

Behind-the-Meter Hybrid

Site integrates genset with on-site PV, BESS, and facility load. Multiple stakeholders: facility, EPC, and utility.

Routes toManufacturing · Data Centers · Mining

Why: this is the most common deployment profile since 2022 — the proprietary hybrid controller is engineered to optimize the genset dispatch against the load and renewable split.

Grid Services / Black-Start

Asset provides substation black-start, spinning reserve, or utility-grade grid-forming operation.

Routes toUtilities

Why: NERC PRC-005 maintenance programs and IEEE 1547 interop are mandatory — the utility row in the matrix above is the only one with this scope.

Process Continuity / Black-Start

Refinery, plant, or process line cannot interrupt: gas turbines, drives, pumps, or compressors must ride-through or restart unattended.

Routes toOil & Gas · Manufacturing

Why: sour-service skids, 72-hour fuel resilience, and API 2350 tank-farm integration live here — the O&G row carries the binding code set.

CODE & STANDARDS  //  ENGINEER NOTE

“Every PowerCore-Series genset shipped since 2019 is built to satisfy NFPA 110 Type 10 with 4-second block-load acceptance, IEEE 1547-2018 interconnection for behind-the-meter and utility applications, IEC 61850 substation-level communication, and EPA Tier 4 Final emissions with aftertreatment integrated — not bolted on. The same line carries UL 2200 listing and ISO 8528-5 Performance Class G3 transient response. These are verified by CSA Group every 90 days, on the production floor, not on a marketing deck. A buyer who pulls the certificate serial number will find it on file at the manufacturer.”

— WesCorp Energy Engineering Standards Office, Houston TX Revision 03 · in effect since 01 April 2025
  • NFPA 110Standard for Emergency and Standby Power Systems, Chapter 7 · Type 10, Class X
  • IEEE 1547-2018Standard for Interconnection and Interoperability of Distributed Energy Resources
  • IEC 61850Communication networks and systems for power utility automation
  • EPA Tier 4 FinalNon-road compression-ignition emissions, verified ≤ 0.02 g/bhp-hr NOx
  • UL 2200Standard for Stationary Engine Generator Assemblies
  • ISO 8528-5Reciprocating internal combustion engine driven alternating current generator sets — Performance

FINAL STEP  //  SITE ASSESSMENT

Every Vertical Above Ends at the Same Request.

A free, written Site Assessment that turns your vertical’s load profile — duty cycle, runtime, code framework, fuel — into a sized generator or hybrid microgrid proposal, delivered by one senior engineer end-to-end. No junior estimators, no handoffs.

$0Cost of the Site Assessment
1Senior engineer assigned per project
10-dayMedian written deliverable turnaround
250 kW–25 MWSizing range covered by a single proposal