Skip to content
UL 2200 · EPA TIER 4F · ISO 8528-5 · CSA AUDITED
DOC-REQ / SAR-2025 Rev. 11 · Houston, TX · 17:48 CT Procurement-grade intake

SECTION 01 / TERMINAL ACTION

Request a Site Assessment.

A direct intake for procurement and engineering leaders evaluating power infrastructure at the $250K–$25M band — backup generation, prime power, or hybrid microgrids from 250 kW to 25 MW. One form. Four fields that matter. A written response inside one business hour.

7-YR

Every PowerCore-Series genset shipped since 2019 is backed by a contractual 99.97% uptime guarantee with financial penalties per hour of deviation. No competitor in our tier will put that in writing. Read the guarantee terms.

SECTION 02 / DIRECT CHANNELS

Talk to a human before the form.

Four verified channels — phone, email, the Houston HQ, and the 24/7/365 emergency dispatch desk. No chatbots, no SDR queues, no ticket deflection. The person who picks up owns your project.

  • PRIMARY LINE · SALES & ENGINEERING

    +1 (713) 555-0482

    Mon–Fri 06:00–20:00 CT · AOE coverage on request

  • EMAIL · SOLUTIONS DESK

    [email protected]

    PGP key on request · First reply < 1 business hour

  • 24/7/365 EMERGENCY DISPATCH

    +1 (713) 555-0482 (option 1)

    Field service · Average response 4 h 12 min

  • HOUSTON HEADQUARTERS

    WesCorp Energy, Inc.
    11400 Energy Drive, Suite 400
    Houston, TX 77099, USA

    Visits by appointment · Security gate at Energy Dr.

Financing inquiries: $410M underwritten since 2018 · default rate < 0.6%. Ask to be routed to the Structured Projects desk.

SITE ASSESSMENT REQUEST · FORM SAR-2025

Project intake.

Procurement-grade fields only. Anything outside the $250K–$25M band or the 250 kW–25 MW envelope should go to a regional distributor — we’ll point you there.

SECTION 03 / POST-SUBMIT TIMELINE

What happens after you submit.

Four stages. Four time windows. Every one in writing. The form is not a black box — it is the entry gate to a procurement process built for buying cycles, not marketing funnels.

  1. 01

    < 1 business hour

    Confirmation + NDA handoff

    A solutions engineer replies directly — not a ticketing system. Standard NDA template attached; countersigned within the same window if flagged.

  2. 02

    ≤ 48 hours

    Engineering kickoff

    Senior PE-licensed engineer assigned. Load profile reviewed against site constraints. Preliminary unit count and footprint locked.

  3. 03

    ≤ 10 business days

    Virtual or on-site walk

    Live walkthrough of the proposed configuration — encrypted video feed to the client for units ≥ 1 MW during factory acceptance testing, or a 9-depot regional engineer on-site.

  4. 04

    Day 14–21

    Written proposal + fixed price

    Bound proposal with line-item scope, UL 2200 / EPA Tier 4 Final / ISO 8528-5 compliance pack, and the 7-Year Uptime Guarantee terms. Financing term sheet if requested.

Engagement standard: every step is documented, every deliverable is countersigned, every decision is traceable to a PE-licensed engineer. No opaque scoping, no scope-creep billing.

SECTION 04 / FIELD SERVICE & DISPATCH

Service that arrives before the problem compounds.

Nine regional service depots sit between the 180,000 sq ft Pasadena assembly facility and any active jobsite on the Gulf Coast. The dispatch desk operates 24/7/365 — a human answers, never a tree — and the average response time on emergency tickets is 4 hours 12 minutes, measured end-to-end from inbound call to wrench-on-site.

Field engineers carry calibrated diagnostics for the full PowerCore product line and the proprietary hybrid controller family. The trailing 24-month first-time-fix rate is 96.4% — verified against service-ticket close codes, not self-reported. When a unit cannot be restored on-site, a replacement is dispatched from the rental-to-purchase fleet of 240+ rotating units within 18 hours on the Gulf Coast corridor, longer on inland routes.

For multi-unit deployments the dispatch desk runs a named-account protocol: a single engineer owns the site for the duration of the contract, carries escalation authority on the 7-Year Uptime Guarantee, and is reachable on a direct line — not a queue.

The Association of Energy Engineers named WesCorp Contractor of the Year in 2023 on the strength of that service record. Power Engineering magazine ranked the company a Top 10 Power Systems Provider — North America in both 2022 and 2024.